CD-60 Celing System 

Installation guide

1 The U28 runners are first fixed to the required ceiling levels.

2. The hangers are then fixed to the ceiling slabs at 1200mm CC and not more than 200mm from Wall end.

3 The main channels are then attached to the hangers and aligned to the required ceiling level at a distance not to exceed 1200mm CC from each other while it should not exceed 200 mm distance from Wall end.

4. The CD60 channels are then clipped to the main channels G-600mm CC

5. The Gypsum Boards are longitudinally fixed by self taping Screws to the CD60 channels at distance not to exceed 250 mm CC

6. The joint are taped and putty applied and ceiling is finished Smooth ready for painting.